It was our great honor to work on this project for “High Commission for the development of Riyadh” Riyadh-KSA
As we provide Design Services and implementation plans for temporary control measures to support all permanent work activities and associated works as set out in Exhibit “D”, Scope Of Services.
The scope of work for this project covers mainly highway design and temporary traffic detour design within Riyadh Metro project which includes all related engineering design and traffic analysis needed to provide efficient traffic flow conditions within the construction zones of the metro and post-metro construction along line 1 (Oalya – Batha Street), and line 2 (King Abdullah Road), covering about forty-two segments of elevated, at-grade and underground sections at and between the metro stations. The project main tasks include:
- Traffic Data Collection and Analysis
- Highway Design
- Traffic Detour Design
- Micro-simulation Modelling
- Traffic Safety Audit
- Results Analysis
- Preparation of Technical Report to present and assess the recommended solutions.
The works start on 16/12/2014 and should be finished 15/12/2019.